To solve the large-scale scheduling problem more efficiently within the requirements of the contract in shipyard, a three-layer parallel valhalla axys computing system was proposed.An optimized model for shipbuilding project scheduling problem was constructed under the condition of taking time and resource constraints into account.Moreover, the key
Alluvial Architecture and Fluvial Cycles in Quaternary Deposits in a Continental Interior Basin, E Hungary
The thickness of the studied Quaternary alluvial complex, locatedin the eastern part of the Pannonian Basin System, can exceed500 m.Based on subsurface facies analysis the following large-scaledepositional elements were identified: channel-fill deposits, point bardeposits, alluvial fan (sandy sheet-flood) deposits, floodplain andfloodbasin deposits
Tricuspid valve dysplasia: A retrospective study of clinical features and outcome in dogs in the UK
The objective of this study was to determine the demographic, clinical and survival characteristics and to identify risk factors for mortality due to tricuspid valve dysplasia in UK dogs.Records of client-owned dogs diagnosed with tricuspid valve dysplasia at a referral centre were retrospectively reviewed.Only dogs diagnosed with tricuspid valve d